In short. Most of what a commercial court lawyer near Rohini Court handles is factory and trade work from North and North West Delhi. The Rohini complex in Sector 14 houses the commercial courts of both districts. They hear business suits from Rs 3 lakh up to Rs 2 crore linked to places like Bawana, Narela, Wazirpur, Mangolpuri, Azadpur, Model Town, Pitampura and Netaji Subhash Place. Unless it's urgent, mediation comes first. A fought suit usually takes one to two years. Start by collecting your delivery, installation and payment records.
Is this your situation?
- You've been supplying raw material, parts or packaging to a factory in Bawana, Narela, Wazirpur, Mangolpuri or Badli, and the account has gone unpaid.
- You sold a machine to a unit in North or North West Delhi and installed it yourself. Now that the balance is due, the buyer says it doesn't work.
- You did job work for a manufacturer. There's a stack of challans and a phone full of messages, but nobody ever signed a contract.
- Your tenant cleared out of an industrial shed, or an office in Netaji Subhash Place, and left the rent and charges behind.
- The buyer's office is in Rohini or Pitampura. Its factory, though, is over the border in Kundli or Bahadurgarh.
- A summons has come from a District Judge (Commercial Court), North or North West.
What gets filed at Rohini Court?
Two of Delhi's judicial districts, North and North West, send their commercial suits to Rohini. The Sector 14 complex has been running since 2005. Each district has its own District Judge courts that carry the Commercial Court designation under Section 3 of the Commercial Courts Act, 2015. You'll be filing here if three things are true. First, what you're fighting about counts as a commercial dispute under Section 2(1)(c) of the Act. Second, the value. Rs 3 lakh or more, but not over Rs 2 crore. Third, the defendant, or the cause of action, is located in North or North West.
Above Rs 2 crore, you're in the Delhi High Court. Its Commercial Division takes those suits. In July 2026 the High Court's Full Court recommended moving the district limit up to Rs 10 crore, which would keep far more cases at places like Rohini. That can't happen without an amendment to the Delhi High Court Act, 1966. As of October 2026 we aren't aware of any change in force. Check before you file.
Spend a day in these courtrooms and you'll hear about factories. A good share of Delhi's big industrial estates are up here (Bawana, Narela, Wazirpur, Mangolpuri, Badli and the Lawrence Road area). There's also the Azadpur wholesale fruit and vegetable market, the office blocks clustered round Netaji Subhash Place, and the coaching belt near Mukherjee Nagar. So the file in front of a Rohini commercial court is just as often a machine that won't perform, a job worker who's owed money, or a shed with rent unpaid, as a simple unpaid invoice. The rules every Delhi district shares are on our page on the Delhi district commercial courts.
Which areas are heard at Rohini?
| Judicial district | Police station areas it has covered (examples) | What business there usually looks like |
|---|---|---|
| North (sits at Rohini) | Model Town, Mukherjee Nagar, Mahendra Park, Adarsh Nagar, Jahangirpuri, Samaipur Badli, Swaroop Nagar, Bhalaswa Dairy, Alipur, Narela, Narela Industrial Area, Bawana, Shahbad Dairy | Trade at Azadpur market, the Badli, Narela and Bawana industrial estates, warehousing, coaching premises |
| North West (sits at Rohini) | Ashok Vihar, Bharat Nagar, Keshav Puram, Subhash Place, Shalimar Bagh, Maurya Enclave, Prashant Vihar, Rohini North, Rohini South, Begumpur, Mangolpuri, Sultanpuri, Aman Vihar, Kanjhawala | Factories at Wazirpur and along Lawrence Road, the Mangolpuri industrial area, offices at Netaji Subhash Place, shops and showrooms in Pitampura and Rohini |
| Not Rohini: Central and West | Burari, Civil Lines, Timarpur (Central); Nangloi, Mundka, Paschim Vihar (West) | These go to Tis Hazari instead |
| Not Delhi at all | Kundli and Rai (Sonipat), Bahadurgarh (Jhajjar) | Haryana districts. A suit resting only on these places goes to whichever court is designated as Commercial Court for that district |
We've drawn these from published district lists. Police station boundaries, and which judicial district each station falls under, get revised now and then, so look up the current list on the district court website.
How territory works in North and North West Delhi
Under Section 20 of the Code of Civil Procedure, 1908 (CPC), you can sue where the defendant carries on business, or where the cause of action arose, wholly or in part. In a supply deal that usually means three places. Where the order was placed. Where the goods were delivered. Where payment was due. In Delhi each of those addresses falls under a police station, and every police station belongs to some judicial district.
North and North West share one building, so confusing the two hurts less than confusing Rohini with Tis Hazari. It still matters, though. Your plaint goes into one particular district, your Section 12A mediation ought to be with that district's legal services authority, and the defendant can object if the facts on territory don't support the choice you made. The bigger trap is at the edges. Burari and Timarpur feel like North Delhi. They've actually been part of the Central district, which sits at Tis Hazari. We cover that side in our guide on a commercial court lawyer near Tis Hazari Court.
Then there's Haryana. It's common to find a business with its office in Rohini or Pitampura and its plant at Kundli, Rai or Bahadurgarh. If the purchase order came from the Pitampura office and your invoices went to that address, Rohini can have jurisdiction even though the goods were all trucked to Haryana. If the order, delivery and payment all happened at the plant, you're probably looking at the Haryana district instead. Commercial suits of any value from Rs 3 lakh upward stay at district level there, and appeals go to the Punjab and Haryana High Court in Chandigarh. Look at where the defendant's assets are before you pick, because that's the court where, sooner or later, you'll be standing to enforce the decree. Assets decide it.
Finding Rohini Court
Its formal name is the District Courts Complex, Sector 14, Rohini, Delhi 110085. Anyone who's spent a morning at Tis Hazari will find it newer and a lot calmer. Both districts' courts, their filing sections, the legal services authority offices, a copying agency and the lawyers' chambers are all on one campus.
Rohini East, on the Red Line, is the nearest metro, a few minutes on foot. Rohini West is the backup. The Red Line crosses the Pink Line at Netaji Subhash Place and the Yellow and Violet lines at Kashmere Gate, so most of Delhi is a single change away. Driving, you come in from the Outer Ring Road side of Rohini. For directors or witnesses on the road from Sonipat, Panipat or Bahadurgarh, it's usually a shorter run than any other Delhi complex.
Try to get there before 10 am. There's the usual security check at the gate. The commercial courts may not be on the same floor as the filing section. Your advocate or clerk will tell you the courtroom, and the district website's cause list shows it the evening before.
The disputes that usually reach Rohini
- Raw material and component supplies. Steel, plastic granules, chemicals, packaging and electrical parts, sold on running accounts to units in Bawana, Narela, Wazirpur and Mangolpuri. Most are plain invoice claims. A few turn on quality complaints that only surfaced once the bills were due.
- Machinery sale, installation and service. Extrusion lines, moulding machines, CNC equipment and compressors, sold with installation and a warranty. Typically the buyer keeps back the last instalment and says the machine's faulty. You'll need technical evidence here, and often a local commissioner.
- Job work. Units that cut, plate, polish, print or mould material for somebody else and charge by the piece. Proof comes from job work challans, GST records and messages.
- Industrial sheds and offices. Rent, maintenance and damages for sheds in the estates, and for offices at Netaji Subhash Place or in Rohini's district centres. If the property was let only for trade or commerce, the lease dispute is commercial. Our page on shop and office lease disputes says more.
- Wholesale produce trade. Claims between growers, commission agents and traders connected with the Azadpur market. The paper trail is mostly sale pattis, bank transfers and transport receipts. Check first whether some market committee procedure covers your dispute.
- Services and IT contracts. Software vendors, marketing agencies and consultants chasing bills from businesses in the Pitampura and Netaji Subhash Place office towers.
Machine and job work cases: what helps, what hurts
A supplier chasing payment for a machine usually stands or falls on three pieces of paper. The installation or commissioning report, signed by someone on the buyer's side. The record of trial production. And whatever complaint log exists. Suppose the buyer signed off on commissioning and then ran the line for months without a word. Its defect story will look thin. Now suppose the first complaint went in a week after installation and nobody ever fixed it. That's your problem, not theirs. Before filing, collect the service engineers' visit reports and the service team's WhatsApp chats. The buyer will be producing its own version of events, count on it.
Sometimes the real fight is over what state the machine is in. Then either party can ask the court for a local commissioner under Order XXVI Rule 9 CPC, who inspects and reports. Or for a scientific investigation under Order XXVI Rule 10A. Timing is the whole game. A report made before anyone dismantles or sells the machine can settle a technical dispute that would otherwise swallow months of expert evidence. Whoever applies normally pays the commissioner's fee to start with.
Small units rarely keep tidy paperwork, and job work claims suffer for it. The GST system helps. When a principal sends goods to a job worker, it reports them in GST form ITC-04, so its own filings show the material went out for processing. Challans, the gate register and messages about piece rates fill in the gaps. Plenty of job workers walk in with only a notebook and a phone. Advocate B.K. Singh's first question to them is the principal's GSTIN, and the claim gets built backwards from the principal's own returns and bank entries. Our guide on a customer who refuses to pay after delivery covers the defences you'll face.
Filing at Rohini Court, one step at a time
This is the usual path for a claim of Rs 3 lakh to Rs 2 crore against a business in North or North West Delhi.
Pin down the district
Put the defendant's office, factory and godown, the delivery point and the bank for payment against their police stations. Then pick North or North West, or a Haryana court if nothing happened in Delhi.
Work out the value
Take the principal and add interest up to the likely filing date. The total needs to be at least Rs 3 lakh and no more than Rs 2 crore. Check the current Delhi limit.
Send a legal notice
List the invoices, state the amount and give a short deadline. In a machine dispute, invite the buyer to a joint inspection. A refusal makes useful evidence later.
Apply for Section 12A mediation
Apply to the legal services authority of the district you've chosen. Turn up with a clean statement of account. Once you have a non-starter or failure report, you can file.
Draft and e-file the plaint
Plead territory, value, court fee and interest clearly. Include a statement of truth and an Order XI affidavit of documents, and put in every document in your power along with the plaint.
Ask for a local commissioner if you need one
Where the dispute is about the condition of goods or a machine, apply for inspection under Order XXVI with the plaint or soon after.
Summons and written statement
The defendant gets 30 days for its written statement and any counter-claim. The court can extend that with costs. Never past 120 days from service.
Case management, evidence and judgment
Documents are admitted or denied, issues framed, and a timetable fixed at the Order XVA case management hearing. Evidence goes in by affidavit, witnesses are cross-examined, and then come written and oral arguments.
Section 12A mediation before a Rohini suit
Unless you're asking for urgent interim relief, a commercial suit needs pre-institution mediation under Section 12A first. It's compulsory. The Supreme Court settled that in Patil Automation v. Rakheja Engineers (2022), for suits filed from 20 August 2022. Apply to the District Legal Services Authority for North or North West, whichever district you're filing in. You get three months, plus two if both sides agree, and none of that time counts against limitation.
Factory owners tend to take mediation more seriously than traders do. A pending suit is a headache when you're applying for bank limits or trying to sell the unit. Agree on a joint inspection of the machine in mediation and a defect dispute can be over faster than any court could manage. If you settle, both sides sign before the mediator, and the settlement has the status of an arbitral award. Our guide on whether mediation is compulsory before a commercial suit explains the exceptions.
Send the right people. A mediation about a disputed extrusion line goes nowhere if the supplier sends its accountant and the buyer sends its lawyer, and nobody else turns up. Someone who can say yes to a figure has to be in the room. For a technical dispute, bring the service engineer or the production manager who actually knows what happened on the floor. And if the other side ignores the notice and never comes, don't chase it for months. Take the non-starter report and file. Limitation won't wait. Neither will the debtor's assets.
How long a Rohini suit takes, and what it costs
| Stage | Usual time | Costs besides the lawyer's fee |
|---|---|---|
| Legal notice | 15 to 30 days | Courier and copies |
| Section 12A mediation | Up to 3 months, plus 2 by consent. Non-starter reports often come sooner | Fee under the 2018 Mediation Rules. Check the current figure |
| E-filing and scrutiny | 1 to 4 weeks | Ad valorem court fee under the Court Fees Act, 1870 as it applies in Delhi. Check the current schedule |
| Local commissioner, if one is appointed | Usually 1 to 3 months to inspect and report | Fee fixed by the court, normally paid first by whoever applied |
| Service and written statement | 1 to 5 months. 120 days is the outer limit for the written statement | Process fees, and costs if a party delays |
| Documents, issues and case management | 2 to 4 months | Small amounts |
| Evidence, technical witnesses included | 4 to 12 months | Witness expenses, a technical expert's fee if you hire one, Section 63 BSA certificates |
| Arguments and judgment | 2 to 6 months | Certified copy charges |
| Execution against machinery, stock or accounts | Ordinarily to be decided within 6 months under Rahul S. Shah v. Jinendra Kumar Gandhi (2021) | Attachment, storage and auction costs |
Papers you'll need for a North or North West Delhi suit
What was agreed
- The quotation, the purchase order and the acceptance
- Machine specifications and the warranty terms
- The job work rate list, or the messages where rates were agreed
- The lease or licence deed for a shed or office
Delivery and installation
- Invoices, delivery challans and e-way bills
- The installation or commissioning report the buyer signed
- Service engineers' visit reports and the complaint log
- Job work challans and entries in the gate register
Where the money went
- Your ledger and bank statements
- GST returns with your sales and, if you can get them, the buyer's purchase entries
- The principal's ITC-04 details, if it's a job work claim
- Any balance confirmation or acknowledgment, or the cheque that bounced
For filing
- The Section 12A report from the North or North West authority
- A board resolution or other authority to sign
- Your legal notice, any reply, and the postal proof
- A Section 63 BSA certificate covering emails, chats, and photos or videos of the machine
What a commercial court lawyer near Rohini Court should bring
A commercial court lawyer near Rohini Court has to be at ease with factory evidence as well as the commercial rules. Reading a commissioning report properly. Knowing what a local commissioner can and can't do. Getting a production manager ready to be cross-examined about machine output. And turning up for the dull-looking dates where commercial suits are quietly won or lost, like the last day for a written statement, admission and denial, and the case management hearing.
You'll find Advocate B.K. Singh in the Delhi district courts, Rohini among them, and in courts around Delhi NCR. Advocate Sadhna Singh works alongside him and runs the firm's recovery and commercial court files from day to day. The firm's offices are in Dwarka, New Delhi and in Vaishali, Ghaziabad. If your factory is in Kundli, or your director's abroad for a month, routine Rohini dates don't need you there. You'll get a short update after each one. For how the firm takes on matters across the city, see our page for a commercial court lawyer in Delhi.
An invented example: a Bawana machine builder and a Narela pipe maker
This one is made up. Picture a machine builder in Bawana Industrial Area that sells a PVC pipe extrusion line to a pipe maker in Narela Industrial Area. Price: Rs 64 lakh plus GST. Rs 42 lakh is paid. The line goes in, it's commissioned, and the buyer's plant head signs the report. Four months on, Rs 22 lakh is still owed, and a letter arrives. The pipes, it says, are coming out uneven in thickness. No more money until that's fixed.
Add interest and the claim is roughly Rs 25 lakh. Both factories fall in the North district, so this is a Rohini suit. Mediation before the North district's legal services authority goes nowhere, because the buyer won't accept anything short of a brand-new line. So the builder sues. Its file has the signed commissioning report, four months of production chatter from the buyer's own staff, the service visit reports and the GST records. With the plaint it asks for a local commissioner to inspect the line before the buyer can take it apart.
The commissioner is an engineer. The line, he reports, runs within specification, and the buyer has been feeding it a cheaper resin. When the written statement comes in, it's mostly about resin, and what's left in dispute is a few lakh in service charges. Another court, on other facts, could see it differently. A commissioner's report is evidence. It isn't a judgment. This illustration is invented and shows a method, not a result.
Mistakes we keep seeing in Rohini filings
- Waiting until the machine is sold. Once a disputed machine has been taken apart, sold or modified, inspecting it proves very little. Ask for a local commissioner early.
- Suing the factory address rather than the entity. Units in the industrial estates are often run by companies or LLPs registered somewhere else entirely. Sue the legal entity named on the GST and MCA records.
- Filing at Rohini against a defendant in Burari or Mundka. Those areas have belonged to Tis Hazari's districts. Look at the police station list.
- Leaning on a job work notebook. A private notebook by itself is weak evidence. Build the claim on GST records, bank entries and challans.
- Forgetting the Haryana factory. If the defendant's only real assets are in Kundli or Bahadurgarh, plan the transfer of the decree before you even file.
- Letting old accounts go time-barred. Three years under the Limitation Act, 1963 is the usual period. A written acknowledgment or a part payment restarts it. A promise on the phone doesn't.
If your business has been sued at Rohini
Start counting from the date of service. Your written statement is due in 30 days. The court can extend that with costs, but never beyond 120 days from service, and once that's gone the right is lost, following SCG Contracts v. K.S. Chamankar (2019). In a summary suit under Order XXXVII CPC, it's 10 days to enter appearance and then 10 days after the summons for judgment to ask for leave to defend.
Maybe you're the buyer, and you stopped paying because the machine or the material was bad. Then your defence needs the same discipline as the supplier's case. Dated complaints, photographs, test reports, rejection notes. If you lost money through wasted raw material or lost production, plead it as a counter-claim in the same suit. Don't save it for later. Courts trust least the defence that first shows up in the written statement with nothing written down from the time of supply.
Read the plaint for territory too. Perhaps the supplier has sued at Rohini while your only premises are in Haryana and no part of the deal touched North or North West Delhi. Object in your written statement, at the first opportunity. Section 21 CPC treats objections to the place of suing that aren't raised early as generally waived.
After judgment: appeals and execution
Appeals from a Rohini commercial court go to the Commercial Appellate Division of the Delhi High Court under Section 13 of the Act. The limit is 60 days. Section 8 bars revision against interlocutory orders. That leaves interim orders open to challenge only where the law gives an appeal or, in narrow cases, under Article 227 of the Constitution.
Execution under Order XXI CPC is filed before the court that passed the decree. Against a factory, attachment can reach its bank accounts, what its own customers owe it, its stock and its movable machinery. Land is harder. Industrial plots in the estates are often held on lease, and the lease terms decide what can be attached and auctioned, so read the allotment papers before planning a sale. Where the assets are in Haryana, the decree is transferred to the court there under Sections 38 and 39 CPC. Our page on execution of decree explains the tools. If the debtor has simply moved to another part of Delhi, our guide on all Delhi district court complexes will help.
What you can do this week
Pull together the quotation, purchase order, invoices, e-way bills, installation report, service records, ledger and bank statements. Write down every address in the deal next to its police station, and check whether any of them lies over the Haryana border. If a machine's at the heart of it, photograph it today and ask in writing for a joint inspection. The general procedure for Delhi districts is on our page on Delhi's district commercial courts. Supply claims get their own page on supply contract disputes.
Been sued? Note the service date today and get the full plaint and documents to a lawyer within the week.
For advice on a Rohini filing, call or WhatsApp +91 96259 61599, or send your papers to Advocate B.K. Singh's team through the contact page.
Frequently asked questions
Does Rohini Court hear cases from Pitampura and Shalimar Bagh?
Yes. Both have fallen within the North West district, which sits at Rohini. Boundaries do get revised, so check the police station for the exact address before you file.
Which metro station is best for Rohini Court?
Rohini East on the Red Line is closest, and Rohini West isn't far. The Red Line takes you there directly from Kashmere Gate or Netaji Subhash Place.
Can I sue a Kundli factory in Rohini if its head office is in Pitampura?
Possibly. A Rohini court may have jurisdiction if the defendant carries on business from the Pitampura office, or the order was placed or payment was due there. If most of its assets are in Haryana, think about execution before you decide.
What does a local commissioner cost in a commercial suit?
The court fixes the fee according to the work involved. Whoever asks for the commission usually pays first. The amount can be adjusted later, when the court decides costs.
Is a suit against an Azadpur commission agent a commercial suit?
Generally yes, if it's a claim between traders arising out of ordinary mercantile dealings and it's worth Rs 3 lakh or more. Check first whether a market committee procedure applies to your dispute.
Can I recover rent for an industrial shed in Bawana through the commercial court?
Usually, if the shed was let only for trade or industry and the claim is Rs 3 lakh or more. Read the original allotment terms too. They may restrict sub-letting.
How do I check my Rohini case status?
Put your CNR number into the eCourts website or app, or use the North or North West district website for cause lists and orders. Orders sometimes go online a day or more after the hearing.
What if the buyer has moved the disputed machine to another factory?
Tell your lawyer fast. You can ask the court to make the defendant disclose where the machine is, to send a commissioner to inspect it there, or in a proper case to stop it being sold.