In short. Yes, you can. Section 16 of the MSMED Act, 2006 applies notwithstanding anything in any agreement between buyer and supplier, so a no-interest clause doesn't stop the claim. If you're a registered micro or small supplier and the buyer paid late, you get compound interest at three times the RBI bank rate. A clause that excludes interest, caps it or stretches credit past 45 days won't cut it down. You can still lose the right through late registration, a genuine later settlement or limitation. This week, check your Udyam date and the payment clause.
Is this your situation?
- The vendor agreement you signed last year says, in bold, that no interest will ever be paid on late payments.
- The buyer's terms give it 90 or 120 days. Or worse, it pays you only once its own client pays it.
- Your invoice footer says 18 percent interest. Their purchase order says 9 percent, simple, and nothing more.
- They finally cleared the principal, seven months late, and their accounts head told you on the phone that interest was never part of the deal.
- To get one stuck payment released, you signed a no-claim letter they drafted. You weren't happy about it.
- You sit on the buyer's side, in finance, and you've been asked whether the company's no-interest clause will actually hold.
Does a no-interest clause stop an MSME's interest claim?
No, provided two things are true: you're a micro or small enterprise on Udyam, and the buyer paid late. Section 16 of the Micro, Small and Medium Enterprises Development Act, 2006 (we'll just say the MSMED Act) puts it plainly. A buyer who misses the time Section 15 gives must pay compound interest, with monthly rests, at three times the bank rate the Reserve Bank of India notifies. Then read the first words of that section: 'notwithstanding anything contained in any agreement between the buyer and the supplier or in any law for the time being in force'. That line in the purchase order, 'no interest shall be payable on delayed payment', is exactly the sort of term it was drafted to knock out.
Section 24 adds weight. It says Sections 15 to 23 have effect notwithstanding anything inconsistent in any other law. So the statutory right sits above your contract, and above general law too. In most cases the question is answered before anyone even opens the purchase order. On interest and on the credit period, Section 16 wins.
But being paid late doesn't automatically mean you'll collect. You have to be inside the Act. The payment has to be late the way the Act measures lateness, not the way you feel about it. You have to claim in time, and you mustn't have given the interest up in a way the law will respect. That's where the real fights happen. We take them one at a time below.
The sections that put Section 16 above your contract
Section 2(b) and Section 15, MSMED Act, 2006
Section 2(b) defines the appointed day as the day after 15 days from acceptance or deemed acceptance of the goods or services. Section 15 then says the buyer must pay on or before the date agreed in writing, or before the appointed day if nothing was agreed. The proviso is short and sharp. The agreed period can't go beyond 45 days from acceptance. A contract giving the buyer 90 days is read as 45 for this purpose. What counts as acceptance is explained in our note on the 45-day payment rule for MSMEs.
Section 16
Three times the RBI bank rate, compounded monthly, running from the appointed day or the day after the agreed date, whatever any agreement or other law says. After the RBI policy of 7 October 2026 the bank rate is 5.75 percent, which makes the current Section 16 rate 17.25 percent a year. Earlier months carry whatever rate was in force then. Don't use one flat figure for the whole period.
Section 17
The buyer is liable to pay the amount with interest as Section 16 provides. That's the debt you can take to the Facilitation Council.
Sections 22 and 23
If the buyer's accounts are audited, it has to disclose in its annual accounts the principal and interest it owes to micro and small suppliers. And under income tax law, Section 16 interest isn't an allowable deduction for the buyer. Both rules take it for granted that the interest is owed, whatever the contract says.
Section 24
Sections 15 to 23 prevail over anything inconsistent in any other law. Put that beside the opening words of Section 16 and you have the reason a no-interest clause can't be enforced against a supplier who qualifies.
MSMED (Amendment) Act, 2026
It came out on 13 August 2026 as Act 16 of 2026, and we understand parts of it took effect from 15 October 2026. As of late October 2026 we hadn't seen the new Sections 18, 18A and 19 notified. Those are the ones bringing in a 90-day mediation stage, recovery as arrears of land revenue, and payment of 50 percent of a challenged award to the supplier. Nothing we've read in the published summaries touches the Section 16 rate. Check the current position before you file.
What 'notwithstanding anything contained in any agreement' really does
Lawyers call it a non obstante clause, from the Latin for 'notwithstanding'. Its job is simple. If the contract points one way and the statute another, the statute wins. Parliament put it there because it knew who drafts the purchase order, and it's never the small supplier. The big buyer sends its standard terms. The supplier signs, or just starts supplying, and those terms nearly always favour the buyer on credit and interest. Section 16 takes that one subject off the table.
There's an older rule pointing the same way. Section 23 of the Indian Contract Act, 1872 makes an agreement void if its object or consideration would defeat the provisions of any law. A clause that exists only to switch off a statutory interest duty is hard to defend under that section as well. You'll rarely need it. The MSMED Act does the work by itself. Still, it's good to know that ordinary contract law gives the buyer no help either.
What the non obstante clause doesn't do is rewrite the rest of your contract. Price, specifications, delivery terms, inspection, warranty: all of that stays as agreed. Section 16 deals only with what happens when payment is late. So when you sit down with the purchase order, split it in two. Clauses on interest and credit period are overridden. Clauses on acceptance and quality aren't, and they can still decide the day interest starts.
Clauses that fall away, and clauses that still bite
- A flat 'no interest on delayed payment' clause. Doesn't survive against a supplier who qualifies. Interest runs at the statutory rate from the due date the Act fixes.
- A cap or a lower rate, say 9 percent simple. Fails to the extent it gives you less than Section 16. The statute sets the rate and the monthly compounding, both.
- Credit of more than 45 days. Cut down to 45 days from acceptance. Interest starts the day after day 45. Not day 90, not day 120.
- Pay-when-paid or back-to-back wording. 'We'll pay you once our client pays us' doesn't push back the due date under Section 15. Under this Act the buyer's cash flow is the buyer's headache.
- Inspection, acceptance and rejection clauses. These still count. If the buyer rejects goods in writing within 15 days of delivery, acceptance moves to the day the defect is cured, and interest on those goods starts later.
- Retention and milestone clauses. They can matter too, because they decide when a particular amount became payable in the first place. Retention released after a defect liability period falls due from the release date in the contract, still inside the 45-day ceiling.
- Set-off and liquidated damages. They don't cancel interest. What a buyer does with them is argue that the principal was smaller, so have an answer ready for each deduction.
Who's protected, and who isn't
The protection belongs to a 'supplier' in the Act's sense, and nobody else. Read that as a micro or small enterprise that has filed its memorandum, which these days means Udyam registration. Medium enterprises sign up on the same portal, but Chapter V doesn't cover them. If you're medium, your contract's interest clause generally stands and you claim under ordinary law. What counts as micro or small? Under the limits in force from 1 April 2025, a micro unit can have up to Rs 2.5 crore invested and up to Rs 10 crore turnover. A small one goes up to Rs 25 crore and Rs 100 crore.
Expect the registration date to be the buyer's main battle. The Supreme Court, in Silpi Industries v. Kerala SRTC (2021) and again in Gujarat State Civil Supplies Corporation v. Mahakali Foods (2022), said the benefits for a contract go only to a supplier who was registered on the day it was made. Then a two-judge bench, in NBCC (India) Ltd v. State of West Bengal (January 2025), took a wider view and sent the issue up to a larger bench. Relying on NBCC, the Delhi High Court in October 2026 allowed a Council reference to proceed even though registration came late. It's unsettled. Until the larger bench rules, read our guide on whether Udyam registration after the contract still helps before you lean on it.
Traders are the other grey area. Retail and wholesale traders were let onto Udyam in 2021 for priority sector lending, and several High Courts have said that doesn't open the Council route to them. If you mostly buy and resell, first look at whether a trader can use the Facilitation Council. Service providers are clearly covered. So are manufacturers and job workers.
Can you give up the interest later?
Timing is everything here. A clause signed before any supply, sitting in the buyer's standard terms, is overridden by Section 16. A settlement struck after the dispute has started is a different animal altogether. Say a supplier knows exactly what it's owed, sits down with the buyer, and agrees to take the principal plus a smaller sum in full and final settlement. That's a compromise of an existing claim. Courts generally respect a genuine compromise like that, on the ordinary principle of accord and satisfaction (an agreed settlement that discharges the old claim). The Act stops the buyer contracting out of interest in advance. It doesn't stop you settling a dispute.
The awkward cases sit in the middle. Some buyers won't release a payment until you sign a no-claim certificate, or a letter saying nothing further is due. In National Insurance Co. v. Boghara Polyfab, decided in 2008, the Supreme Court accepted that a discharge signed under coercion or economic pressure doesn't necessarily end the claim. The party alleging pressure has to prove it, though. So if you sign one of these, put the pressure on record that same day, in an email. Don't wait a year to complain.
Paying the principal late doesn't wipe out the interest either. In SRK Metals and Plastics v. State of Assam (2026), the Gauhati High Court held that a supplier's interest claim couldn't be brushed aside just because the principal was paid while the case was on. Advocate B.K. Singh gives every MSME client the same small tip. Whenever a part payment comes in, or you're asked to sign something to get one, write back the same day that you accept it 'without prejudice to our claim for interest under Section 16 of the MSMED Act'. One line. It has saved more interest claims than any argument we've made later.
Does the arbitration clause or the contract rate matter before the Council?
Before the Facilitation Council, no. In Mahakali Foods (2022) the Supreme Court held that Chapter V of the MSMED Act overrides a private arbitration agreement once a supplier makes a reference under Section 18. The Council then applies the Act, Section 16 included. The section fixes the rate and gives the Council no discretion to pick a lower one. At conciliation, of course, the two sides can agree any settlement they like.
It gets messier outside the Council. Say the supplier bypasses it and invokes the arbitration clause in the contract. In some cases, Shristi Infrastructure Development v. Scorpio Engineering (2025) among them, the Delhi High Court has treated Sections 15 and 16 as a substantive right that an arbitral tribunal can apply. But in Idemia Syscom India v. Conjoinix Total Solutions (2025) the same court hinted that where the parties picked contractual arbitration and never used Section 18, the right may not apply on its own. If interest is a big part of what you're owed and you still have a choice of forum, that doubt alone points to the Council.
In a civil suit you can plead Section 16 interest. Expect the buyer to push for the ordinary rule under Section 34 of the Code of Civil Procedure, where interest is at the court's discretion. The commercialcourtlawyer.com guide on interest in a recovery suit shows how courts handle it. And at the NCLT? In SNJ Synthetics v. PepsiCo India Holdings (2025), the NCLAT refused to count Section 16 interest toward the insolvency threshold where the contract had no interest clause. Our note on when an MSME can go to insolvency instead of the Council covers that route.
Claiming the interest when the contract shuts it out
You can do the first four steps yourself in about a week. What happens after that depends on the buyer.
Check that the Act covers you
Pull out your Udyam certificate and note the registration date and category. Put it next to the date of the purchase order, rate contract or work order behind each unpaid invoice. Any invoice raised under a contract older than your registration goes in a separate pile.
Mark up the clauses the Act overrides
Take a marker to the no-interest clause, any cap, the credit period and any pay-when-paid wording. Use a different colour for the inspection and rejection clauses. Those can still shift your start date.
Work out each invoice's due date
Acceptance is normally the day of delivery or service, unless the buyer raised a written objection within 15 days. Add the agreed credit period, but never more than 45 days. Nothing agreed in writing? Use 15 days. Interest starts the following day.
Prepare the interest sheet
Use three times the bank rate in force for each month, compounded monthly, and knock off every part payment on the date it came in. The method is shown in our worked example on how to calculate MSME delayed payment interest.
Send a demand that cites Section 16
Write to the buyer with principal and interest shown separately and the sheet attached. Add a sentence saying Section 16 applies notwithstanding the clause in its purchase order. Ask for payment, or a written reply, within 15 days.
Take it to the Facilitation Council
If the money doesn't come, file a Section 18 reference online. The guide to filing an MSME Samadhaan complaint online goes through the form screen by screen. Claim interest up to the filing date, and further interest until payment.
Stand firm in conciliation, or settle on your own terms
At the first sitting the buyer will read out its clause. You answer with Sections 16 and 24 and Mahakali Foods. If you accept less, make it a deliberate business call recorded in writing. Never give ground just because someone read a clause aloud.
If it goes on to arbitration before the Council, the award will normally direct interest at the Section 16 rate until payment. A buyer that wants to challenge it has to deposit 75 percent of the awarded amount first, under Section 19.
Time and money at each stage
| Stage | Usual time | Costs apart from any lawyer's fee |
|---|---|---|
| Going through registration, contract and invoices | 2 to 5 days | Nil |
| Interest sheet with your accountant | A few days to 2 weeks, depending on how many invoices | Your accountant's time; a CA certificate if you want one |
| Demand notice and the buyer's reply | 15 to 30 days | Postage or courier |
| Online reference to the Council | About a day once the papers are ready | No government filing fee as we write; check the portal for the current position |
| Pre-Council talks and conciliation | Often 1 to 6 months, depending on the Council | Travel if a physical sitting is fixed |
| Arbitration by the Council or an institution | Section 18(5) says 90 days; in practice 6 to 18 months or longer is common | Institution fees if the Council sends the case to an arbitration centre; check its current schedule |
| Buyer's challenge and enforcement | Months, or a few years if fought hard | The buyer deposits 75 percent before its challenge is heard; court fee on execution as per the state schedule |
An invented example: a Kundli fabricator and a 'no interest' purchase order
This one is made up, to show the arithmetic and the arguments. A fabrication unit in Kundli, Sonipat, registered on Udyam as a micro enterprise in 2022, makes steel racks for a Gurugram warehousing company. The buyer's standard purchase order, issued in March 2026, gives 90 days' credit and says in bold that no interest shall be payable on any delayed payment. Racks worth Rs 12 lakh are delivered and installed in early April 2026. Nobody complains about them. The money arrives in late October. That's almost seven months after delivery.
As far as the buyer's accounts team is concerned, the file is closed. The unit's owner has read Section 16 and wants to know if the clause matters. For this purpose, it doesn't. The credit period is read down to 45 days, so payment fell due in late May. Interest runs from the next day, for about five months, on Rs 12 lakh, compounded monthly at three times the bank rate for each month. With the rate at roughly 16.5 percent and rising to 17.25 percent in October, it comes to a little over Rs 85,000.
The owner sends a demand with the working attached and a line quoting the opening words of Section 16. The buyer writes back that the supplier 'accepted the terms by supplying'. So the unit files a reference. At conciliation the buyer's man offers half. The owner holds out and accepts a figure close to the full amount, payable within 30 days, and signs a settlement recording that it's in full and final settlement of the interest claim. He's bound by that. He made it after the dispute arose, with the numbers in front of him. The purchase order clause never bound him at all.
Papers that beat a no-interest clause
Proof you're covered
- Your Udyam certificate, showing the date and the category
- The old Udyog Aadhaar or EM-II acknowledgment, if you ever had one
- Turnover figures for the years in question, if your category might have changed
What you signed
- The purchase order, rate contract or vendor agreement, with the interest and credit clauses marked
- Any vendor registration form or code of conduct they made you sign
- Emails where the buyer refused to budge from its standard terms
Delivery and acceptance
- Invoices, delivery challans, e-way bills and goods receipt notes
- For services, installation or completion certificates and the sign-off emails
- Every written rejection or complaint the buyer ever sent, with dates
Money and letters
- Bank statements showing when each payment actually landed
- Any no-claim letter or settlement you signed, plus the emails showing why you signed it
- Your demand notice, their reply, and proof that each was delivered
The buyer's usual arguments, and the answers
First comes consent. 'You signed the purchase order, so you agreed to no interest.' But Section 16 works notwithstanding any agreement, so whether you agreed is beside the point. Then the commercial argument: the price assumed long credit, and interest would hand you a windfall. Parliament heard that one already. It answered by capping credit at 45 days.
The third argument is conduct, and it's the one to take seriously. Five years of dealing, never a rupee of interest charged, never an interest invoice raised, every late payment taken without protest. Sometimes this works. Not because a supplier can be estopped from relying on a statute, but because years of silence give the buyer room to say a later settlement covered everything. When Advocate B.K. Singh reads a buyer's reply in these matters, he first splits the arguments into two heaps: those attacking the debt, and those attacking only the interest. If the buyer doesn't dispute the principal and argues only about its clause, the reply is weaker than it looks. You can say exactly that at the first conciliation sitting.
Fourth, limitation. Interest can't bring a time-barred claim back to life. In Sonali Power Equipments (2025), the Supreme Court held that conciliation can go ahead on an old claim, but the arbitration stage is subject to the Limitation Act. Test each invoice using our note on the time limit for an MSME delayed payment claim.
The contract names another city. Where is the claim heard?
The Council of the supplier's own state hears it. That's you. Section 18(4) says so, and the Supreme Court held in Harcharan Dass Gupta v. Union of India (May 2025) that this statutory rule beats a seat of arbitration fixed by contract. A Bawana or Okhla unit files before the Delhi Council, even if the buyer's terms insist that 'courts at Mumbai alone shall have jurisdiction'. If the award is challenged, the challenge goes to the courts that have jurisdiction over that Council.
Got units in more than one state? Usually it's the unit that made the supply, and that appears on the Udyam record, that decides it. See which Council has jurisdiction. If the buyer sits in another state, the practical side of notices and enforcement is in our guide on recovering dues from a buyer in another state.
How it plays out for different suppliers and buyers
- Manufacturers supplying goods. The cleanest case there is. The delivery challans fix acceptance, and once you're registered the no-interest clause counts for nothing.
- Service providers and IT vendors. Same right, but proving acceptance is harder. Hold on to sign-off emails, approved timesheets and milestone certificates. The buyer will say it never accepted the service.
- Job workers. You get interest on the job charge you billed, not on the value of the buyer's own material. Make that obvious in your sheet.
- Works contractors. Whether a composite works contract falls under the Act has been argued in several courts. Take advice before you build a large construction claim on Section 16.
- Suppliers to PSUs and government departments. Tender conditions often rule out interest. The Act binds them as buyers just the same. Expect a long reply, though, and a Section 34 challenge to any award.
- Medium enterprises. Sorry, Section 16 won't help you. The contract's interest clause generally decides it, subject to what a court awards under ordinary law.
If you're the buyer, what should you do about your clause?
Stop relying on it for micro and small suppliers. Keeping it in your standard terms gets you nothing against a registered supplier, and it lulls your accounts team into thinking they're safe. The interest you owe has to appear in your audited accounts under Section 22. It can't be deducted for income tax under Section 23. And late payments also affect the deduction for the underlying expense under Section 43B(h) of the Income-tax Act, 1961, and the matching rule in the new Income-tax Act, 2025.
Companies owing micro or small suppliers for more than 45 days also have to report those dues to the Registrar of Companies in a half-yearly return, which we explain in our note on MSME Form 1. A supplier's lawyer often looks for those filings first. They can work as an admission. The real fix is boring. Pick out MSME vendors by their Udyam numbers and pay them within 45 days. If a claim has already landed, our guide on how a buyer can settle an MSME claim without paying full interest sets out the realistic options.
Your to-do list for this week
Find your Udyam certificate. Then gather the purchase orders behind each invoice that's unpaid or was paid late. One colour for the interest and credit clauses, another for acceptance and rejection. Write out every invoice with three dates against it: delivery, any written rejection, and the day the money really reached you. If you ever signed a no-claim letter, dig it out along with the emails from that week. Then do the interest sum, or have your accountant do it, following our note on when an MSME can claim interest at three times the bank rate.
Don't sign anything new in exchange for a payment unless it carries the Section 16 reservation line. And don't let the clause in the buyer's terms talk you out of claiming. For a supplier who qualifies, it's usually the weakest part of the buyer's case.
Want someone to look over your purchase orders, payment history and interest sheet before you send a demand or file a reference? Or to hear when the law on registration and interest moves? Share your papers with Advocate B.K. Singh's team through the contact page.
Frequently asked questions
Is a 'no interest on delayed payments' clause illegal?
Putting it in a contract isn't a crime. It just can't be enforced against a registered micro or small supplier, because Section 16 of the MSMED Act applies notwithstanding any agreement. The supplier still gets statutory interest. Against a medium enterprise or a supplier outside the MSME definitions, the clause may well hold.
Can the buyer and an MSME agree a lower interest rate in the purchase order?
Not in a way that binds you before a dispute. Anything below three times the bank rate, or simple interest in place of monthly compounding, is overridden by Section 16. Once a dispute has arisen, the two of you can settle on whatever figure you like.
My invoices never mentioned interest. Does Section 16 still apply?
Yes. The right comes from the statute, not your invoice. Printing interest terms on invoices doesn't hurt, and leaving them off doesn't waive anything. What does help is a written demand for interest once payment is late.
The buyer has paid the principal. Can I still claim interest later?
Yes, if you're within limitation. Courts have held that paying the principal doesn't wipe out statutory interest for the delay. When the money arrives, write back that you accept it without prejudice to your interest claim. Then the buyer can't later call it full settlement.
Will the Facilitation Council cut the interest because the contract said none?
It shouldn't. The Act fixes the rate and gives the Council no power to lower it on that ground. During conciliation the Council may nudge you towards a compromise, and you're free to accept less. At the arbitration stage, if you qualify, the award should follow Section 16.
What about a contract signed before the MSMED Act existed?
The Act came into force in October 2006. Older contracts throw up questions of earlier law and transition, and the Supreme Court has held that the interest provisions don't apply to supplies made before the relevant law came into force. Claims that old will usually have limitation problems too.
Can a medium enterprise claim three times the bank rate?
No. Chapter V of the MSMED Act, Section 16 included, protects only micro and small suppliers. A medium enterprise has to rely on its contract and on whatever interest a court or tribunal awards under general law.
Will I pay tax on the interest I get?
Generally yes. Interest you receive is your income and it's taxed in the normal way. Ask your chartered accountant how and when to show it in your books. The Section 23 rule on non-deductibility hits the buyer, not you.